Bunker Survey Calculation Software

Bunker Survey Calculation Software Rating: 3,6/5 8250 votes

Adharam madhuram ringtone free download. For your search query Adharam Madhuram MP3 we have found 1000000 songs matching your query but showing only top 10 results. Now we recommend you to Download first result अभ तक नह स न ह ग ईतन म ठ स वर म Adharam Madhuram Madhurashtakam Best MP3 which is uploaded by Mahanubhav of size 12.92 MB, duration 9 minutes and 49 seconds and bitrate is 192 Kbps.

Survey

Amy winehouse back black 320 rare. Draft survey Program- detailed draft survey program step by step make your printable report - Duration: 6:58. Heitham Issa 4,412 views.

Download Raja Yoga By Swami Vivekananda Bangla free ebook pdf file e-book name- Raja Yoga Author. BANGLA PDF BOOKS DOWNLOAD: দ্য মহাভারত সিক্রেট।.

In my last post How To Conduct Bunker Survey, I have explained the general step for Bunker Survey conducts. Now, the topic is about the way to calculate ship bunker that we have found on the ship tanks. It is suggested to read the last post to become familiar with calculation.
  • Go Auto - The automatic calculation of the draft survey, bunker survey and oil survey. Safe Time - Safe your calculation time and easy to adjust the miscalculation. Save Data - Export and Import survey data for saving and recalling the survey data in the future.
  • Quantity delivered calculation, based on density testing. Detailed bunker survey reports. Sampling documentation photographs as requested or permitted. Intertek's marine bunker fuel surveying services are supported by experienced bunker fuel quality testing laboratories. Marine bunker fuels are tested to ISO 8217, Marpol Annex VI and other.

The bunker calculation is simple and needs the following:
- Tank Sounding data and Tank Capacity Table. The Corrected Sounding means below is the sounding after correcting with vessel’s trim and list.
- Oil Density @15C,
Now we could go with sample of 1 tank to test the calculation.
Software
FO Tank No. 1 Center, Corrected Sounding = 3.27 Meter, Temperature = 34 degrees celcius, Density @ 15 C = 0.9870.
Tank Volume at Sounding 3.20 M = 157.20 Cubic Meter, at Sounding 3.30 M = 163.60 Cubic Meter.
- The Quantity in Metric Ton = Oil Vol x VCF x WCF,
- Observe Volume = {(3.27 – 3.20) / (3.30 – 3.20) x (163.60 – 157.20)} + 157.20 = (0.07/0.10) x (6.40) + 157.20 = 4.48 + 157.20 = 161.68 Cu.M.
Bunker Survey Calculation Software
- T 54B (VCF) > Density @ 15C 0.9903 at 34 C = 0.9870 (see the picture below you need to interpolate if any different numbers on both columns).

- T 56 (WCF) : Density @15C 0.9903 at 34 C = 0.9892 (Quick formula with reducing factor for WCF is Density @ 15C – 0.0011 = 0.9903 – 0.0011 = 0.9892). We don’t need to see the table anymore.
- So, The Quantity in MT is 161.68 x 0.9870 x 0.9892 = 157.85 MT. Sample calculation tanks sounding attached below.

Note : If you do calculation with Volume in Barrel, just uses ASTM Table 6B for VCF, ASTM Table 11 for WCF in Long Ton and then ASTM Table 13 for WCF in Metric Ton.

Surveyors
Sumber berita dan gambar : sevensurveyor.com